HB 144 Readiness Assessment

Is Your Co-Op Ready for the January 2027 Filing?

10 questions · 2 minutes · Instant compliance gap report

The AcreSeal HB 144 Readiness Assessment is a free 10-question gap analysis that maps your current pole-management practices to each of the nine Sec. 38.103 subsections. It takes about 5 minutes and produces a letter-grade scored report plus a downloadable PDF you can share with your board or G&T cooperative. No login required — enter your email to receive the full PDF report.

Question 1 of 10~3 min remaining
Sec. 38.103(b)(1)

Do you have a documented inventory of all distribution poles in your system?

About this assessment

How long does the HB 144 readiness assessment take?

Under 5 minutes. The assessment is 10 questions, each with 2-3 multiple-choice options. After the last question, a scored gap report is generated immediately on-screen. Entering your email then sends a downloadable PDF version you can share with your board or G&T cooperative.

What does the readiness assessment measure?

It maps your current practices to each of the 9 subsections of Texas HB 144 Sec. 38.103: pole inventory, roles and responsibilities, inspection management, landowner complaint handling, per-pole timelines and record-keeping, personnel training and certification, budget (IOUs only), monthly reporting, and triennial updates. Each answer is scored 0-2 and aggregated into a letter grade.

Is the readiness assessment free?

Yes, the assessment and scored gap report are free. There is no paywall, account creation, or sales call required to see your results. Entering your email is optional — it triggers a downloadable PDF copy but the on-screen results are fully accessible without it.